Asmuss supplies to Watercare's Glendowie Branch sewer upgrade

Written by Rafaela Mendes | 23 May 2021

Fulton Hogan is carrying out the construction of the new 1km long x DN2100 storage tunnel. This project required a new 17m deep wastewater pumping station.

"The new pipe travels from a new pump station in Maybury Reserve, up Elstree Avenue and then along part of Taniwha Street. To install the pipe we are using a tunnel boring machine (TBM) which digs tunnels deep beneath the ground. The TBM is lowered nine-metre-deep hole, and then tunnels to the next site..." (source: Fulton Hogan)

Asmuss supplied the Valmatic Surgebuster non return valves, hand wheels / actuators, AVK gate valves and dismantling joints.